PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600).jpg Temporary Electrical panel at Elev. 1,2,3 Facing South (800x600).jpg Underground Storm sewer Facing North (800x600).jpg Excavating for the underground sanitary Sewer Facing West (800x600).jpg Installing PVC pipe for temporary power Facing North (800x600).jpg Underground sewer Facing South (800x600).jpg
Previous pageNext page Installing PVC pipe for temporary power Facing North (800x600)
Installing PVC pipe for temporary power Facing North (800x600)